miércoles, julio 17
“Ayuntamiento

ADOT announces lane restrictions on Interstate 8 in Yuma for August

YUMA, Arizona- The Arizona Department of Transportation advises drivers to plan ahead for lane restrictions on Interstate 8 in Yuma beginning at 7 p.m. on Monday, August 1.

Contractors are scheduled to install a new barrier wall as part of the I-8 Bridge Deck Rehabilitation project.

The following restrictions will occur:

• Eastbound and Westbound I-8 at 4th Street will be reduced to one lane for 24 hours and 7 days a week beginning 7 p.m. Monday, August 1, and ending Friday, September 30.

• The speed limit on I-8 will be reduced to 55 mph.

• Harold C. Giss Parkway (milepost 1) will be reduced to one lane in both directions on weekdays from 6 a.m. to 6 p.m.

• The speed limit on Harold C. Giss Parkway (milepost 1) will be reduced to 25 mph.

• A 14-foot width restriction will be in place.

Delays are likely, so travelers should allow extra travel time. Drivers should obey posted signs, speed limits and traffic control devices and use caution around construction personnel.